《江蘇省南京市東山外國語學(xué)校高中英語 U4 Reading 理解附答案 選修7》由會員分享,可在線閱讀,更多相關(guān)《江蘇省南京市東山外國語學(xué)校高中英語 U4 Reading 理解附答案 選修7(4頁珍藏版)》請在裝配圖網(wǎng)上搜索。
1、江蘇省南京市東山外國語學(xué)校高中英語選修七 U4 Reading 理解附答案
【學(xué)習(xí)目標(biāo)】
1.Gain some information about the London Underground, practice their spoken English and share
ideas with each other in a group and a class.
2. Gain some knowledge about the development of the public transport, practice their reading skills
and improv
2、e their overall ability.
3. Put the skill in reading strategy (how to read an argument) into practice.
【學(xué)習(xí)重難點】
1. know the structure of tourist brochure.
2. know how to read tourist brochure.
【學(xué)習(xí)方法】
1. 熟讀單詞表單詞p49-53,注意把音標(biāo)讀準(zhǔn)。
2. 通過自上而下的閱讀,分析文章的框架,了解Reading的主旨大意。
3. 通過對文章的進(jìn)一步閱讀,了解世界上第一條地鐵的
3、發(fā)展過程。
【預(yù)習(xí)內(nèi)容】
任務(wù)一:熟讀單詞表單詞Page49-53,注意把音標(biāo)讀準(zhǔn)。
任務(wù)二:請同學(xué)們課前完成Pre-reading questions.
1. Do Part D on Page 52.
2. Read the passage do Part A on Page50 and do Part C1 on Page 52.
3. Read the passage again and do part C2 on Page 52 after discussion in pairs.
4. Read the text once more and Do Part E o
4、n Page 53.
任務(wù)三:Try to know the structure of a tourist brochure.
【課堂教學(xué)】
1. 檢查單詞預(yù)習(xí)情況。
2. 在老師的幫組下閱讀課文,理解課文框架。
3. 檢查Pre-reading完成情況,掌握課文內(nèi)容并復(fù)述。
【目標(biāo)檢測】
I. Choose the correct answer:
1. What fame does the London Underground have? ( )
A. It is the oldest and most complex underground
5、system. B. It is the longest underground.
C. It is the busiest underground. D. It is the most modern underground.
2. When was the last line added?
A. In 1884 B. In 1902 C. In 1933 D. In 1979
3. What is the right structure of this text? (
6、 )
A. ①② ‖ ③④ ‖ ⑤⑥ ‖ ⑦
B. ① ‖ ②③④ ‖ ⑤ ‖ ⑥⑦
C. ① ‖ ②③ ‖ ④⑤⑥ ‖ ⑦
D. ①②③ ‖ ④ ‖ ⑤⑥ ‖ ⑦
II. Fill in the blanks according to the text.
(1)_________ why the first underground system was developed
l Most trains to London only went to the outer city limits.
l Horse-drawn buses, trams, cabs and
7、carriages were used to (2)_______ people to and around the city centre.
l The number of vehicles on the road caused unbelievable traffic jams.
(3)__________ of the underground system before World War II
In 1854,the British government gave approval to the (4)____________ by the Metropolitan Railw
8、ay Company of an underground railway in the centre of London.
In 1868,the next section of the underground system was opened in the south of London.
In 1884,the first railway tunnel under the River Thames was dug.
In 1933, a public organization (5)________ the London Passenger Transport Board was
9、created.
Some unusual (6)_____of the underground system during World War II
l When London was bombed, many underground stations (7)_______ as bomb shelters.
l A new line was used as a center for directing the defence (8)_______ air attacks.
l A station was used by the Prime Minister as meeting r
10、ooms for the administration of government.
(9)_________ and popularity of the first underground system
Over three million people travel on the underground every day.
The network of the underground system (10)___________ twelve lines now goes twenty-six miles out of central London.
附參考答案:ADB Readings convey Development construction called uses functioned against Expansion including