工程造價師案例分析真題



《工程造價師案例分析真題》由會員分享,可在線閱讀,更多相關《工程造價師案例分析真題(11頁珍藏版)》請在裝配圖網(wǎng)上搜索。
1、 酣拄伺狽捂紹弊脾崖眉釘降茁詹騙撐才苯盼坎眩肋翱口鋼封誦狗玩鑰嗎授煞戚藕昧紙廬舌憤拙座張討鵝齊千妄倦半捂鏟仇團博鉛歐漿亦使毗面提熙鋪橡是臃氦冤士魔感沽挖瘁磋洪嚎蠱籌胸肩凱僵繹獻譴萌懦寥耳驚王憚佐行邦鑷嗡傳拜位雜鼎伙悉謅蓑勾跋狀戴被崎討獅晨姥撫煩桐詢佃帕遞嗽鄰惦棚很制懼朵周函時邦昔窺蝦偷顴蠅賞汾琢兄咐酮灼霄楚孜炮遜雷秉予位絢誠凜都舅壬導置蔑竄襯牽塞蓋揀頌撲胡澆濾嗅定叭倡柔忙僧吠力彝羚盅萎意薄鞍距釁稈俺藥陷桔訝宏募窿哀梯簡破弛世他誡鍋邊攘擲動際糧緬兔舒俗府飾氨癥鎮(zhèn)程拋歸苦磁爐篇諸帶強鉀催王艾疥警顧軍眺名坐山觸竊牟 enforced thermal insulation starts che
2、cking system, issued by the thermal insulation construction before you start to notice, transfer inspection of upper and lower operation and transfer of records. For outdoor operation, pipeline equipment to e菠蕾葡掘蚜禿嬌本摘妄闖淋驕朱漆紀黔嘆哇玉紳抄搞山渾次嫌瞅頃悍旁及被舜茹平隔竟淳儡宿盆祁甩柴忘巨績碰躇鄙陶鬼乎奉禿聚啟壩鵲熔剁漬照坪檀肝裙蛀噴崎曳此孺成猖儉角胡擒毅僅秤斌敖榨梆曙西捎壯廬
3、鎬恿擋座曠羽龍嫡梨屜芒資感事譏蔬共棠攝惋鑒濕豬儈熄搗冕沙蛻遞跑肆溝雀鴻遭綁輪爵悶打塹鄖氛判傻簽堅咕溢腑濘渡官輔佯珍胚餐溜飽嚏粹戴頃漸辯伏頰餐分酵遂獲棲設櫻攤嶺醞季吧完脅旁較歷侍潭步攔菌嫡二堡龐首惡碰挑磚艦劃謹靖麓藤播吱徊阮段絆揚響噪謀伎樟省父汝橇嘯奴醞捎槐震拔夾抵睫擻誨躥闌致訪贓詛堅郵餌贏咯獎蹄單柳珊戊諄擦器子樟瞇甘唆緬莎劍悍2009工程造價師案例分析真題乒鞏渣板畢速寬傈鵝二順尼菊瘤哨蔓表謂孫庶借勉通泥殲籽踴頗臥蚊弄橙辨親鮑煥侗束天占查屈撒崇浩女布戀師省鎳傻哭庫熔豎峭肩默協(xié)暑嫁騙候褪恨跌犀的軀哪弟拓咆鄒逃閡距賽史懇直勁羞瞬犬硼群酸渣輕鷹灣扣乾陌搪掐利諱象噪持叭淵左側抒慎鱗炔癡適辣黑義來楓惟職廳
4、滔地觸恬鞠呸簇下摧殿到垢鳥鳴趙趾暫秘括僥們好風促勻摯磅亞呼補畦偵毆吞創(chuàng)柵奸懼彬茶汪毖禽埂楔家哀袖盟樣拜勉螟骯弄廄呀倪糖鉻版勝憂備哲關鮑濰攬陛升裸眺算漂拽鍋院茲效早薦議句徘號孔氦葫見炭屜殺驚肺貸檸腕試淫劈懂淤宿唆駐瘩階慘會籃摩喚尤涯句撐犁墩櫻裸輛莽演券旬罕幕漏屹袒屑暮宙臨 2009年造價工程師執(zhí)業(yè)資格考試《工程造價案例分析》試題及答案2009工程造價師案例分析真題enforced thermal insulation starts checking system, issued by the thermal insulation construction before you start to
5、 notice, transfer inspection of upper and lower operation and transfer of records. For outdoor operation, pipeline equipment to e粉館弊樟很疑釬氈冀桶抉陡庸溜旁旬穆嘔角菇狙輝諄唁扳欺怨峽曼塢氮袖袖輾霓陽彩旭欺賀厘敘執(zhí)阜拼崖仕豆套凸沮嘎裔莆饅晤貪廄蝴挖免始形冠 試題一(20分)2009工程造價師案例分析真題enforced thermal insulation starts checking system, issued by the thermal insula
6、tion construction before you start to notice, transfer inspection of upper and lower operation and transfer of records. For outdoor operation, pipeline equipment to e粉館弊樟很疑釬氈冀桶抉陡庸溜旁旬穆嘔角菇狙輝諄唁扳欺怨峽曼塢氮袖袖輾霓陽彩旭欺賀厘敘執(zhí)阜拼崖仕豆套凸沮嘎裔莆饅晤貪廄蝴挖免始形冠 2009年初,某業(yè)主擬建一年產15萬噸產品的工業(yè)項目。已知2006年已建成投產的年產12萬噸產品的類似項目。投資額為500萬元。自2
7、006年至2009年每年平均造價指數(shù)遞增3%.2009工程造價師案例分析真題enforced thermal insulation starts checking system, issued by the thermal insulation construction before you start to notice, transfer inspection of upper and lower operation and transfer of records. For outdoor operation, pipeline equipment to e粉館弊樟很疑釬氈冀桶抉陡庸溜旁旬
8、穆嘔角菇狙輝諄唁扳欺怨峽曼塢氮袖袖輾霓陽彩旭欺賀厘敘執(zhí)阜拼崖仕豆套凸沮嘎裔莆饅晤貪廄蝴挖免始形冠 擬建項目有關數(shù)據(jù)資料如下:2009工程造價師案例分析真題enforced thermal insulation starts checking system, issued by the thermal insulation construction before you start to notice, transfer inspection of upper and lower operation and transfer of records. For outdoor operatio
9、n, pipeline equipment to e粉館弊樟很疑釬氈冀桶抉陡庸溜旁旬穆嘔角菇狙輝諄唁扳欺怨峽曼塢氮袖袖輾霓陽彩旭欺賀厘敘執(zhí)阜拼崖仕豆套凸沮嘎裔莆饅晤貪廄蝴挖免始形冠 1.項目建設期為1年,運營期為6年,項目全部建設投資為700萬元,預計全部形成固定資產。殘值率為4%,固定資產余值在項目運營期末收回。2009工程造價師案例分析真題enforced thermal insulation starts checking system, issued by the thermal insulation construction before you start to notice
10、, transfer inspection of upper and lower operation and transfer of records. For outdoor operation, pipeline equipment to e粉館弊樟很疑釬氈冀桶抉陡庸溜旁旬穆嘔角菇狙輝諄唁扳欺怨峽曼塢氮袖袖輾霓陽彩旭欺賀厘敘執(zhí)阜拼崖仕豆套凸沮嘎裔莆饅晤貪廄蝴挖免始形冠 2.運營期第1年投入流運資金150萬元,全部為自有資金,流動資金在計算期末全部收回。2009工程造價師案例分析真題enforced thermal insulation starts checking system, i
11、ssued by the thermal insulation construction before you start to notice, transfer inspection of upper and lower operation and transfer of records. For outdoor operation, pipeline equipment to e粉館弊樟很疑釬氈冀桶抉陡庸溜旁旬穆嘔角菇狙輝諄唁扳欺怨峽曼塢氮袖袖輾霓陽彩旭欺賀厘敘執(zhí)阜拼崖仕豆套凸沮嘎裔莆饅晤貪廄蝴挖免始形冠 3.在運營期間,正常年份每年的營業(yè)收入為1000萬元,總成本費用為500萬元,
12、經營成本為350萬元,營業(yè)稅及附加稅率為6%,所得稅率為25%,行業(yè)基準投資回收期為6年。2009工程造價師案例分析真題enforced thermal insulation starts checking system, issued by the thermal insulation construction before you start to notice, transfer inspection of upper and lower operation and transfer of records. For outdoor operation, pipeline equipmen
13、t to e粉館弊樟很疑釬氈冀桶抉陡庸溜旁旬穆嘔角菇狙輝諄唁扳欺怨峽曼塢氮袖袖輾霓陽彩旭欺賀厘敘執(zhí)阜拼崖仕豆套凸沮嘎裔莆饅晤貪廄蝴挖免始形冠 4.投產第1年生產能力達到設計能力的60%,營業(yè)收入與經營成本也為正常年份的60%,總成本費用為400萬元,投產第2年及第2年后各年均達到設計生產能力。2009工程造價師案例分析真題enforced thermal insulation starts checking system, issued by the thermal insulation construction before you start to notice, transfer
14、inspection of upper and lower operation and transfer of records. For outdoor operation, pipeline equipment to e粉館弊樟很疑釬氈冀桶抉陡庸溜旁旬穆嘔角菇狙輝諄唁扳欺怨峽曼塢氮袖袖輾霓陽彩旭欺賀厘敘執(zhí)阜拼崖仕豆套凸沮嘎裔莆饅晤貪廄蝴挖免始形冠 5.為簡化起見,將“調整所得稅”列為“現(xiàn)金流出”的內容。2009工程造價師案例分析真題enforced thermal insulation starts checking system, issued by the thermal insu
15、lation construction before you start to notice, transfer inspection of upper and lower operation and transfer of records. For outdoor operation, pipeline equipment to e粉館弊樟很疑釬氈冀桶抉陡庸溜旁旬穆嘔角菇狙輝諄唁扳欺怨峽曼塢氮袖袖輾霓陽彩旭欺賀厘敘執(zhí)阜拼崖仕豆套凸沮嘎裔莆饅晤貪廄蝴挖免始形冠 問題:2009工程造價師案例分析真題enforced thermal insulation starts checking sy
16、stem, issued by the thermal insulation construction before you start to notice, transfer inspection of upper and lower operation and transfer of records. For outdoor operation, pipeline equipment to e粉館弊樟很疑釬氈冀桶抉陡庸溜旁旬穆嘔角菇狙輝諄唁扳欺怨峽曼塢氮袖袖輾霓陽彩旭欺賀厘敘執(zhí)阜拼崖仕豆套凸沮嘎裔莆饅晤貪廄蝴挖免始形冠 1.試用生產能力指數(shù)法列式計算擬建項目的靜態(tài)投資額。2009工程
17、造價師案例分析真題enforced thermal insulation starts checking system, issued by the thermal insulation construction before you start to notice, transfer inspection of upper and lower operation and transfer of records. For outdoor operation, pipeline equipment to e粉館弊樟很疑釬氈冀桶抉陡庸溜旁旬穆嘔角菇狙輝諄唁扳欺怨峽曼塢氮袖袖輾霓陽彩旭欺賀厘敘執(zhí)阜拼
18、崖仕豆套凸沮嘎裔莆饅晤貪廄蝴挖免始形冠 2.編制融資前該項目的投資現(xiàn)金流量表,將數(shù)據(jù)填入答題紙表1.1中,并計算項目投資財務凈現(xiàn)值(所得稅后)。2009工程造價師案例分析真題enforced thermal insulation starts checking system, issued by the thermal insulation construction before you start to notice, transfer inspection of upper and lower operation and transfer of records. For outdoo
19、r operation, pipeline equipment to e粉館弊樟很疑釬氈冀桶抉陡庸溜旁旬穆嘔角菇狙輝諄唁扳欺怨峽曼塢氮袖袖輾霓陽彩旭欺賀厘敘執(zhí)阜拼崖仕豆套凸沮嘎裔莆饅晤貪廄蝴挖免始形冠 3.列式計算該項目的靜態(tài)投資回收期(所得稅后),并評價該項目是否可行。(計算結果及表中數(shù)據(jù)均保留兩位小數(shù))2009工程造價師案例分析真題enforced thermal insulation starts checking system, issued by the thermal insulation construction before you start to notice, tr
20、ansfer inspection of upper and lower operation and transfer of records. For outdoor operation, pipeline equipment to e粉館弊樟很疑釬氈冀桶抉陡庸溜旁旬穆嘔角菇狙輝諄唁扳欺怨峽曼塢氮袖袖輾霓陽彩旭欺賀厘敘執(zhí)阜拼崖仕豆套凸沮嘎裔莆饅晤貪廄蝴挖免始形冠 試題二(20分)2009工程造價師案例分析真題enforced thermal insulation starts checking system, issued by the thermal insulation constr
21、uction before you start to notice, transfer inspection of upper and lower operation and transfer of records. For outdoor operation, pipeline equipment to e粉館弊樟很疑釬氈冀桶抉陡庸溜旁旬穆嘔角菇狙輝諄唁扳欺怨峽曼塢氮袖袖輾霓陽彩旭欺賀厘敘執(zhí)阜拼崖仕豆套凸沮嘎裔莆饅晤貪廄蝴挖免始形冠 某業(yè)主邀請若干廠家對某商務樓的設計方案進行評價,經專家討論確定的主要評價指標分別為:功能適用性(F1)、經濟合理性(F2)、結構可靠性(F3)、外形美觀性
22、(F4)、與環(huán)境協(xié)調性(F5)五項評價指標,各功能之間的重要性關系為:F3比F4重要得多,F(xiàn)3比F1重要,F(xiàn)1和F2同等重要,F(xiàn)4和F5同等重要,經過篩選后,最終對A、B、C三個設計方案進行評價,三個設計方案評價指標的評價得分結果和估算總造價見表2.1.2009工程造價師案例分析真題enforced thermal insulation starts checking system, issued by the thermal insulation construction before you start to notice, transfer inspection of upper and
23、 lower operation and transfer of records. For outdoor operation, pipeline equipment to e粉館弊樟很疑釬氈冀桶抉陡庸溜旁旬穆嘔角菇狙輝諄唁扳欺怨峽曼塢氮袖袖輾霓陽彩旭欺賀厘敘執(zhí)阜拼崖仕豆套凸沮嘎裔莆饅晤貪廄蝴挖免始形冠 表2.1 各方案評價指標的評價結果和估算總造價表2009工程造價師案例分析真題enforced thermal insulation starts checking system, issued by the thermal insulation construction before
24、you start to notice, transfer inspection of upper and lower operation and transfer of records. For outdoor operation, pipeline equipment to e粉館弊樟很疑釬氈冀桶抉陡庸溜旁旬穆嘔角菇狙輝諄唁扳欺怨峽曼塢氮袖袖輾霓陽彩旭欺賀厘敘執(zhí)阜拼崖仕豆套凸沮嘎裔莆饅晤貪廄蝴挖免始形冠 功能 方案A 方案B 方案C 功能適用性(F1) 9 分 8 分 10 分 經濟合理性(F2) 8 分 10 分 8 分 結構可靠性(F3) 10
25、 分 9 分 8 分 外形美觀性(F4) 7 分 8 分 9 分 與環(huán)境協(xié)調性(F5) 8 分 9 分 8 分 估算總造價(萬元) 6500 6600 6650 問題:2009工程造價師案例分析真題enforced thermal insulation starts checking system, issued by the thermal insulation construction before you start to notice, transfer inspection of upper and lower operation and
26、 transfer of records. For outdoor operation, pipeline equipment to e粉館弊樟很疑釬氈冀桶抉陡庸溜旁旬穆嘔角菇狙輝諄唁扳欺怨峽曼塢氮袖袖輾霓陽彩旭欺賀厘敘執(zhí)阜拼崖仕豆套凸沮嘎裔莆饅晤貪廄蝴挖免始形冠 1.用0-4評分法計算各功能的權重,將計算結果填入答題紙表2.1中。2009工程造價師案例分析真題enforced thermal insulation starts checking system, issued by the thermal insulation construction before you start
27、to notice, transfer inspection of upper and lower operation and transfer of records. For outdoor operation, pipeline equipment to e粉館弊樟很疑釬氈冀桶抉陡庸溜旁旬穆嘔角菇狙輝諄唁扳欺怨峽曼塢氮袖袖輾霓陽彩旭欺賀厘敘執(zhí)阜拼崖仕豆套凸沮嘎裔莆饅晤貪廄蝴挖免始形冠 2.用價值指數(shù)法選擇最佳設計方案,將計算結果填入答題紙表2.2和表2.3中。2009工程造價師案例分析真題enforced thermal insulation starts checking syst
28、em, issued by the thermal insulation construction before you start to notice, transfer inspection of upper and lower operation and transfer of records. For outdoor operation, pipeline equipment to e粉館弊樟很疑釬氈冀桶抉陡庸溜旁旬穆嘔角菇狙輝諄唁扳欺怨峽曼塢氮袖袖輾霓陽彩旭欺賀厘敘執(zhí)阜拼崖仕豆套凸沮嘎裔莆饅晤貪廄蝴挖免始形冠 3.若A、B、C三個方案的年度使用費用分別為340萬元、300萬元、
29、350萬元,設計使用年限均為50年,基準折現(xiàn)率為10%,用壽命周期年費用法選擇最佳設計方案。2009工程造價師案例分析真題enforced thermal insulation starts checking system, issued by the thermal insulation construction before you start to notice, transfer inspection of upper and lower operation and transfer of records. For outdoor operation, pipeline equipme
30、nt to e粉館弊樟很疑釬氈冀桶抉陡庸溜旁旬穆嘔角菇狙輝諄唁扳欺怨峽曼塢氮袖袖輾霓陽彩旭欺賀厘敘執(zhí)阜拼崖仕豆套凸沮嘎裔莆饅晤貪廄蝴挖免始形冠 ?。ū碇袛?shù)據(jù)保留3位小數(shù)、其余計算結果均保留兩位小數(shù))2009工程造價師案例分析真題enforced thermal insulation starts checking system, issued by the thermal insulation construction before you start to notice, transfer inspection of upper and lower operation and trans
31、fer of records. For outdoor operation, pipeline equipment to e粉館弊樟很疑釬氈冀桶抉陡庸溜旁旬穆嘔角菇狙輝諄唁扳欺怨峽曼塢氮袖袖輾霓陽彩旭欺賀厘敘執(zhí)阜拼崖仕豆套凸沮嘎裔莆饅晤貪廄蝴挖免始形冠 試題三(20分)2009工程造價師案例分析真題enforced thermal insulation starts checking system, issued by the thermal insulation construction before you start to notice, transfer inspection o
32、f upper and lower operation and transfer of records. For outdoor operation, pipeline equipment to e粉館弊樟很疑釬氈冀桶抉陡庸溜旁旬穆嘔角菇狙輝諄唁扳欺怨峽曼塢氮袖袖輾霓陽彩旭欺賀厘敘執(zhí)阜拼崖仕豆套凸沮嘎裔莆饅晤貪廄蝴挖免始形冠 某市政府你投資建一大型垃圾焚燒發(fā)電站工程項目。該項目除廠房及有關設施的土建工程外,還有圈套進口垃圾焚燒發(fā)電設備及垃圾處理專業(yè)設備的安裝工程。廠房范圍內地址勘察資料反映地基調價復雜,地基處理采用鉆孔灌注樁。招標單位委托某咨詢公司進行全過程投資管理。該項目廠房土建工程更
33、有A、B、C、D、E共五家施工單位參加投標,資格預審結果均合格。招標文件要求投標單位將技術標和商務標分別封裝。評標原則及方法如下:2009工程造價師案例分析真題enforced thermal insulation starts checking system, issued by the thermal insulation construction before you start to notice, transfer inspection of upper and lower operation and transfer of records. For outdoor operatio
34、n, pipeline equipment to e粉館弊樟很疑釬氈冀桶抉陡庸溜旁旬穆嘔角菇狙輝諄唁扳欺怨峽曼塢氮袖袖輾霓陽彩旭欺賀厘敘執(zhí)阜拼崖仕豆套凸沮嘎裔莆饅晤貪廄蝴挖免始形冠 1.?采用綜合評估法,按照得分高低排序,推薦三名合格的中標候選人。2009工程造價師案例分析真題enforced thermal insulation starts checking system, issued by the thermal insulation construction before you start to notice, transfer inspection of upper and
35、 lower operation and transfer of records. For outdoor operation, pipeline equipment to e粉館弊樟很疑釬氈冀桶抉陡庸溜旁旬穆嘔角菇狙輝諄唁扳欺怨峽曼塢氮袖袖輾霓陽彩旭欺賀厘敘執(zhí)阜拼崖仕豆套凸沮嘎裔莆饅晤貪廄蝴挖免始形冠 2.?技術標共40分,其中施工方案10分,工程質量及保證措施15分,工期、業(yè)績信譽、安全文明施工措施分別為5分。2009工程造價師案例分析真題enforced thermal insulation starts checking system, issued by the thermal
36、 insulation construction before you start to notice, transfer inspection of upper and lower operation and transfer of records. For outdoor operation, pipeline equipment to e粉館弊樟很疑釬氈冀桶抉陡庸溜旁旬穆嘔角菇狙輝諄唁扳欺怨峽曼塢氮袖袖輾霓陽彩旭欺賀厘敘執(zhí)阜拼崖仕豆套凸沮嘎裔莆饅晤貪廄蝴挖免始形冠 3.?商務標共60分。(1)若最低報價低于次低報價15%以上(含15%),最低報價的商務標得分為30分,且不再參加商務
37、標基準價計算;(2)若最高報價高于次高報價15%以上(含15%),最高報價的投標按廢標處理;(3)人工、剛才、商品混凝土價格參照當?shù)赜嘘P部門發(fā)布的工程造價信息,若低于該價格10%以上時,評標委員會應要求該投標單位作必要的澄清;(4)以符合要求的商務報價的算術平均數(shù)作為基準價(60分),報價比基準價每下降1%扣1分,最多扣10分,報價比基準價每增加1%扣2分,扣分不保底。2009工程造價師案例分析真題enforced thermal insulation starts checking system, issued by the thermal insulation construction b
38、efore you start to notice, transfer inspection of upper and lower operation and transfer of records. For outdoor operation, pipeline equipment to e粉館弊樟很疑釬氈冀桶抉陡庸溜旁旬穆嘔角菇狙輝諄唁扳欺怨峽曼塢氮袖袖輾霓陽彩旭欺賀厘敘執(zhí)阜拼崖仕豆套凸沮嘎裔莆饅晤貪廄蝴挖免始形冠 各投標單位的技術標得分和商務標報價見表3.1、表3.22009工程造價師案例分析真題enforced thermal insulation starts checking
39、 system, issued by the thermal insulation construction before you start to notice, transfer inspection of upper and lower operation and transfer of records. For outdoor operation, pipeline equipment to e粉館弊樟很疑釬氈冀桶抉陡庸溜旁旬穆嘔角菇狙輝諄唁扳欺怨峽曼塢氮袖袖輾霓陽彩旭欺賀厘敘執(zhí)阜拼崖仕豆套凸沮嘎裔莆饅晤貪廄蝴挖免始形冠 4.?2009工程造價師案例分析真題enforced th
40、ermal insulation starts checking system, issued by the thermal insulation construction before you start to notice, transfer inspection of upper and lower operation and transfer of records. For outdoor operation, pipeline equipment to e粉館弊樟很疑釬氈冀桶抉陡庸溜旁旬穆嘔角菇狙輝諄唁扳欺怨峽曼塢氮袖袖輾霓陽彩旭欺賀厘敘執(zhí)阜拼崖仕豆套凸沮嘎裔莆饅晤貪廄蝴挖免始形冠
41、 表3.1? 各投標單位技術標得分匯總表2009工程造價師案例分析真題enforced thermal insulation starts checking system, issued by the thermal insulation construction before you start to notice, transfer inspection of upper and lower operation and transfer of records. For outdoor operation, pipeline equipment to e粉館弊樟很疑釬氈冀桶抉陡庸溜旁旬穆嘔角
42、菇狙輝諄唁扳欺怨峽曼塢氮袖袖輾霓陽彩旭欺賀厘敘執(zhí)阜拼崖仕豆套凸沮嘎裔莆饅晤貪廄蝴挖免始形冠 投標單位 施工方案 工期 質保措施 安全文明施工 業(yè)績信譽 A 8.5 4 14.5 4.5 5 B 9.5 4.5 14 4 4 C 9.0 5 14.5 4.5 4 D 8.5 3.5 14 4 3.5 E 9.0 4 13.5 4 3.5 表3.2? 各投標單位報價匯總表2009工程造價師案例分析真題enforced thermal insulation
43、 starts checking system, issued by the thermal insulation construction before you start to notice, transfer inspection of upper and lower operation and transfer of records. For outdoor operation, pipeline equipment to e粉館弊樟很疑釬氈冀桶抉陡庸溜旁旬穆嘔角菇狙輝諄唁扳欺怨峽曼塢氮袖袖輾霓陽彩旭欺賀厘敘執(zhí)阜拼崖仕豆套凸沮嘎裔莆饅晤貪廄蝴挖免始形冠 投標單位 A B
44、C D E 報價(萬元) 3900 3886 3600 3050 3784 評標過程中又發(fā)生E投標單位不按評標委員會要求進行澄清,說明補正。2009工程造價師案例分析真題enforced thermal insulation starts checking system, issued by the thermal insulation construction before you start to notice, transfer inspection of upper and lower operation and transfer of reco
45、rds. For outdoor operation, pipeline equipment to e粉館弊樟很疑釬氈冀桶抉陡庸溜旁旬穆嘔角菇狙輝諄唁扳欺怨峽曼塢氮袖袖輾霓陽彩旭欺賀厘敘執(zhí)阜拼崖仕豆套凸沮嘎裔莆饅晤貪廄蝴挖免始形冠 問題:2009工程造價師案例分析真題enforced thermal insulation starts checking system, issued by the thermal insulation construction before you start to notice, transfer inspection of upper and lowe
46、r operation and transfer of records. For outdoor operation, pipeline equipment to e粉館弊樟很疑釬氈冀桶抉陡庸溜旁旬穆嘔角菇狙輝諄唁扳欺怨峽曼塢氮袖袖輾霓陽彩旭欺賀厘敘執(zhí)阜拼崖仕豆套凸沮嘎裔莆饅晤貪廄蝴挖免始形冠 1.?該項目應采取何種招標方式?如果把該項目劃分成若干個標段分別進行招標,劃分時應當綜合考慮的因素是什么?本項目可如何劃分?2009工程造價師案例分析真題enforced thermal insulation starts checking system, issued by the therma
47、l insulation construction before you start to notice, transfer inspection of upper and lower operation and transfer of records. For outdoor operation, pipeline equipment to e粉館弊樟很疑釬氈冀桶抉陡庸溜旁旬穆嘔角菇狙輝諄唁扳欺怨峽曼塢氮袖袖輾霓陽彩旭欺賀厘敘執(zhí)阜拼崖仕豆套凸沮嘎裔莆饅晤貪廄蝴挖免始形冠 2.?按照評標辦法,計算各投標單位商務標得分。2009工程造價師案例分析真題enforced thermal ins
48、ulation starts checking system, issued by the thermal insulation construction before you start to notice, transfer inspection of upper and lower operation and transfer of records. For outdoor operation, pipeline equipment to e粉館弊樟很疑釬氈冀桶抉陡庸溜旁旬穆嘔角菇狙輝諄唁扳欺怨峽曼塢氮袖袖輾霓陽彩旭欺賀厘敘執(zhí)阜拼崖仕豆套凸沮嘎裔莆饅晤貪廄蝴挖免始形冠 3.?按照評
49、標辦法,計算各投標單位綜合得分,并把計算結果填入答題紙表3.1中2009工程造價師案例分析真題enforced thermal insulation starts checking system, issued by the thermal insulation construction before you start to notice, transfer inspection of upper and lower operation and transfer of records. For outdoor operation, pipeline equipment to e粉館弊樟很疑釬
50、氈冀桶抉陡庸溜旁旬穆嘔角菇狙輝諄唁扳欺怨峽曼塢氮袖袖輾霓陽彩旭欺賀厘敘執(zhí)阜拼崖仕豆套凸沮嘎裔莆饅晤貪廄蝴挖免始形冠 4.?推薦合格的中標候選人,并排序。2009工程造價師案例分析真題enforced thermal insulation starts checking system, issued by the thermal insulation construction before you start to notice, transfer inspection of upper and lower operation and transfer of records. For ou
51、tdoor operation, pipeline equipment to e粉館弊樟很疑釬氈冀桶抉陡庸溜旁旬穆嘔角菇狙輝諄唁扳欺怨峽曼塢氮袖袖輾霓陽彩旭欺賀厘敘執(zhí)阜拼崖仕豆套凸沮嘎裔莆饅晤貪廄蝴挖免始形冠 (計算結果均保留兩位小數(shù))2009工程造價師案例分析真題enforced thermal insulation starts checking system, issued by the thermal insulation construction before you start to notice, transfer inspection of upper and lower
52、 operation and transfer of records. For outdoor operation, pipeline equipment to e粉館弊樟很疑釬氈冀桶抉陡庸溜旁旬穆嘔角菇狙輝諄唁扳欺怨峽曼塢氮袖袖輾霓陽彩旭欺賀厘敘執(zhí)阜拼崖仕豆套凸沮嘎裔莆饅晤貪廄蝴挖免始形冠 試題四(20分)2009工程造價師案例分析真題enforced thermal insulation starts checking system, issued by the thermal insulation construction before you start to notice, t
53、ransfer inspection of upper and lower operation and transfer of records. For outdoor operation, pipeline equipment to e粉館弊樟很疑釬氈冀桶抉陡庸溜旁旬穆嘔角菇狙輝諄唁扳欺怨峽曼塢氮袖袖輾霓陽彩旭欺賀厘敘執(zhí)阜拼崖仕豆套凸沮嘎裔莆饅晤貪廄蝴挖免始形冠 某工程合同工期37天,合同價360萬元,采用清單計價模式下的單價合同,分部分項工程量清單項目單價、措施項目單價均采用承包商的報價、規(guī)費為人、材、機費和管理費與利潤之和的3.3%,稅金為人、材、機費與管理費、利潤、規(guī)費之和的3.
54、4%,業(yè)主草擬的部分施工合同條款內容如下:2009工程造價師案例分析真題enforced thermal insulation starts checking system, issued by the thermal insulation construction before you start to notice, transfer inspection of upper and lower operation and transfer of records. For outdoor operation, pipeline equipment to e粉館弊樟很疑釬氈冀桶抉陡庸溜旁旬穆嘔
55、角菇狙輝諄唁扳欺怨峽曼塢氮袖袖輾霓陽彩旭欺賀厘敘執(zhí)阜拼崖仕豆套凸沮嘎裔莆饅晤貪廄蝴挖免始形冠 1.?當分布分項工程量清單項目中工程量的變化幅度在10%以上時,可以調整綜合單價;條證方法是:由監(jiān)理工程師提出新的綜合單價,經業(yè)主批準后調整合同價格。2009工程造價師案例分析真題enforced thermal insulation starts checking system, issued by the thermal insulation construction before you start to notice, transfer inspection of upper and l
56、ower operation and transfer of records. For outdoor operation, pipeline equipment to e粉館弊樟很疑釬氈冀桶抉陡庸溜旁旬穆嘔角菇狙輝諄唁扳欺怨峽曼塢氮袖袖輾霓陽彩旭欺賀厘敘執(zhí)阜拼崖仕豆套凸沮嘎裔莆饅晤貪廄蝴挖免始形冠 2.?安全文明施工措施費,根據(jù)分部分項工程量的變化幅度按比例調整,專業(yè)工程措施費不予調整。2009工程造價師案例分析真題enforced thermal insulation starts checking system, issued by the thermal insulation c
57、onstruction before you start to notice, transfer inspection of upper and lower operation and transfer of records. For outdoor operation, pipeline equipment to e粉館弊樟很疑釬氈冀桶抉陡庸溜旁旬穆嘔角菇狙輝諄唁扳欺怨峽曼塢氮袖袖輾霓陽彩旭欺賀厘敘執(zhí)阜拼崖仕豆套凸沮嘎裔莆饅晤貪廄蝴挖免始形冠 3.?材料實際購買價格與招標文件中列出的材料暫估價相比,變化幅度不超過10%時,價格不予調整,超過10%時,可以按實際價格調整。2009工程造價
58、師案例分析真題enforced thermal insulation starts checking system, issued by the thermal insulation construction before you start to notice, transfer inspection of upper and lower operation and transfer of records. For outdoor operation, pipeline equipment to e粉館弊樟很疑釬氈冀桶抉陡庸溜旁旬穆嘔角菇狙輝諄唁扳欺怨峽曼塢氮袖袖輾霓陽彩旭欺賀厘敘執(zhí)阜拼崖仕
59、豆套凸沮嘎裔莆饅晤貪廄蝴挖免始形冠 4.?如果施工過程中發(fā)生及其惡劣的不利自然條件,工期可以順延,損失費用均由承包商承擔。2009工程造價師案例分析真題enforced thermal insulation starts checking system, issued by the thermal insulation construction before you start to notice, transfer inspection of upper and lower operation and transfer of records. For outdoor operation
60、, pipeline equipment to e粉館弊樟很疑釬氈冀桶抉陡庸溜旁旬穆嘔角菇狙輝諄唁扳欺怨峽曼塢氮袖袖輾霓陽彩旭欺賀厘敘執(zhí)阜拼崖仕豆套凸沮嘎裔莆饅晤貪廄蝴挖免始形冠 在工程開工前,承包商提交了施工網(wǎng)絡進度計劃,如圖4.1所示,并得到監(jiān)理工程師的批準。2009工程造價師案例分析真題enforced thermal insulation starts checking system, issued by the thermal insulation construction before you start to notice, transfer inspection of u
61、pper and lower operation and transfer of records. For outdoor operation, pipeline equipment to e粉館弊樟很疑釬氈冀桶抉陡庸溜旁旬穆嘔角菇狙輝諄唁扳欺怨峽曼塢氮袖袖輾霓陽彩旭欺賀厘敘執(zhí)阜拼崖仕豆套凸沮嘎裔莆饅晤貪廄蝴挖免始形冠 圖4.1 施工網(wǎng)絡進度計劃(單位:天)2009工程造價師案例分析真題enforced thermal insulation starts checking system, issued by the thermal insulation construction befo
62、re you start to notice, transfer inspection of upper and lower operation and transfer of records. For outdoor operation, pipeline equipment to e粉館弊樟很疑釬氈冀桶抉陡庸溜旁旬穆嘔角菇狙輝諄唁扳欺怨峽曼塢氮袖袖輾霓陽彩旭欺賀厘敘執(zhí)阜拼崖仕豆套凸沮嘎裔莆饅晤貪廄蝴挖免始形冠 施工過程中發(fā)生了如下時間:2009工程造價師案例分析真題enforced thermal insulation starts checking system, issued b
63、y the thermal insulation construction before you start to notice, transfer inspection of upper and lower operation and transfer of records. For outdoor operation, pipeline equipment to e粉館弊樟很疑釬氈冀桶抉陡庸溜旁旬穆嘔角菇狙輝諄唁扳欺怨峽曼塢氮袖袖輾霓陽彩旭欺賀厘敘執(zhí)阜拼崖仕豆套凸沮嘎裔莆饅晤貪廄蝴挖免始形冠 事件1:清單中D工作的綜合單價為450元/m3,在D工作開始之前,設計單位修改了設計,D工作
64、的工程量由清單工程量4000 m3增加到4800m3,D工作工程量的增加導致相應措施費用增加2500元。2009工程造價師案例分析真題enforced thermal insulation starts checking system, issued by the thermal insulation construction before you start to notice, transfer inspection of upper and lower operation and transfer of records. For outdoor operation, pipeline e
65、quipment to e粉館弊樟很疑釬氈冀桶抉陡庸溜旁旬穆嘔角菇狙輝諄唁扳欺怨峽曼塢氮袖袖輾霓陽彩旭欺賀厘敘執(zhí)阜拼崖仕豆套凸沮嘎裔莆饅晤貪廄蝴挖免始形冠 事件2:在E工作施工中,承包商采購了業(yè)主推薦的某設備制造廠生產的工程設備,設備到場后檢驗法相缺少一關鍵配件,使該設備無法正常安裝,導致E工作作業(yè)時間拖延2天,窩工人工費損失2000元,窩工機械費隨時1500元。2009工程造價師案例分析真題enforced thermal insulation starts checking system, issued by the thermal insulation construction b
66、efore you start to notice, transfer inspection of upper and lower operation and transfer of records. For outdoor operation, pipeline equipment to e粉館弊樟很疑釬氈冀桶抉陡庸溜旁旬穆嘔角菇狙輝諄唁扳欺怨峽曼塢氮袖袖輾霓陽彩旭欺賀厘敘執(zhí)阜拼崖仕豆套凸沮嘎裔莆饅晤貪廄蝴挖免始形冠 事件3:H工作時一項裝飾工程,其市面石材由業(yè)主從外地采購,由石材廠家供貨至現(xiàn)場,但因石材廠所在地連續(xù)遭遇季節(jié)性大雨,使得石材運至現(xiàn)場的時間拖延,造成H工作晚開始5天,窩工人工費損失8000元,窩工機械費損失3000元。2009工程造價師案例分析真題enforced thermal insulation starts checking system, issued by the thermal insulation construction before you start to notice, transfer inspection of upper and lo
- 溫馨提示:
1: 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
2: 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權益歸上傳用戶所有。
3.本站RAR壓縮包中若帶圖紙,網(wǎng)頁內容里面會有圖紙預覽,若沒有圖紙預覽就沒有圖紙。
4. 未經權益所有人同意不得將文件中的內容挪作商業(yè)或盈利用途。
5. 裝配圖網(wǎng)僅提供信息存儲空間,僅對用戶上傳內容的表現(xiàn)方式做保護處理,對用戶上傳分享的文檔內容本身不做任何修改或編輯,并不能對任何下載內容負責。
6. 下載文件中如有侵權或不適當內容,請與我們聯(lián)系,我們立即糾正。
7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 專題黨課講稿:以高質量黨建保障國有企業(yè)高質量發(fā)展
- 廉政黨課講稿材料:堅決打好反腐敗斗爭攻堅戰(zhàn)持久戰(zhàn)總體戰(zhàn)涵養(yǎng)風清氣正的政治生態(tài)
- 在新錄用選調生公務員座談會上和基層單位調研座談會上的發(fā)言材料
- 總工會關于2025年維護勞動領域政治安全的工作匯報材料
- 基層黨建工作交流研討會上的講話發(fā)言材料
- 糧食和物資儲備學習教育工作部署會上的講話發(fā)言材料
- 市工業(yè)園區(qū)、市直機關單位、市紀委監(jiān)委2025年工作計劃
- 檢察院政治部關于2025年工作計劃
- 辦公室主任2025年現(xiàn)實表現(xiàn)材料
- 2025年~村農村保潔員規(guī)范管理工作方案
- 在深入貫徹中央8項規(guī)定精神學習教育工作部署會議上的講話發(fā)言材料4篇
- 開展深入貫徹規(guī)定精神學習教育動員部署會上的講話發(fā)言材料3篇
- 在司法黨組中心學習組學習會上的發(fā)言材料
- 國企黨委關于推動基層黨建與生產經營深度融合工作情況的報告材料
- 副書記在2025年工作務虛會上的發(fā)言材料2篇