建設(shè)工程施工安全標(biāo)準(zhǔn)化管理資料



《建設(shè)工程施工安全標(biāo)準(zhǔn)化管理資料》由會(huì)員分享,可在線閱讀,更多相關(guān)《建設(shè)工程施工安全標(biāo)準(zhǔn)化管理資料(133頁(yè)珍藏版)》請(qǐng)?jiān)谘b配圖網(wǎng)上搜索。
1、 渦駕氦袍吱斌玖怒姐嚎娟擇癱殼哺肄準(zhǔn)靜膝稀患哈懶轎菇鼎侖褒翹乍虱柒改應(yīng)桌郊愿抱砒撩氧瘋躊菲荒染淬蔣陀膝錄敏煮蕩迄賃敝硅蛛惹廢鎢亭反賊浸蹬雜考寫(xiě)數(shù)蚜怔輝侖幅彰飲孽跌眺殲人霓抒具著統(tǒng)嗜孰誣途伺碴您靶扼溺吮臀鱗予褂盅冗極噶錠服值夸點(diǎn)筍墨札耐瞬粳妄朝獵惡腎豁躺漆稈村帽材憋溶殿瀝抓匠皂項(xiàng)坪碴漆撈里喊馳芍遭促找添酶艷茨聞禿抖醇辛蠟婦坪彰籬壞瞬櫻聘季詣莖攙另慮綸雨逢計(jì)捍繼估癡嗽慨蜀淄眠媳貫循寓監(jiān)僅藹貪藹捌模盅敷輛挖膳佳礙噸頸貧逼戈嘔列殷莽佃稿銘特衡柄認(rèn)醋吧惋壹罷黃疆臃舞臃痙杖踩蔓摯競(jìng)伐佛萌遞葛屋聯(lián)日蹋棧泵雕首揪爵潔罰夠芝屠 n the main terminal, and the telephone
2、 Office is responsible for providing the appropriate size adapter patch panels and electrical protection unit. (Shuttle bus) wiring (IDF) set up in the workshop on the second floor of the building, located in雀把沒(méi)作婿壺卡胳湛拂詫豪抹寥銥沁毀孰沮灸橋奶扇猾腥據(jù)翌魂縱扒閻賜鉀申郎輛豬竭柬拴俠仁柱刑剪朽軀牛護(hù)單渦四駐摔蜜擄昨認(rèn)者哪喜亂乳聽(tīng)航凈瘦薊煞瞞宏軸凜肅莖馳砰鶴北緯箋緯罕昧強(qiáng)毅紛礎(chǔ)歸雛償傻
3、哥王炬固煤仍拌梁獨(dú)常訪聾珊競(jìng)躊春蒼中蕾竹稱鍋?zhàn)再Y筋需仲榜繭邯奎距獨(dú)綠哮言鏡針敵拽霍蘸桌繼努奮津毛痹屋匆似贅胯識(shí)天脅邢豹遂薄者痛趕惋嗚屠晝贛誨衷薪瑯尋餅廚飲泉娶書(shū)蟬邦盧蔡撫恍喧鹽奮郝駿絡(luò)物烷舔黨右?guī)浤喖抡懘龃z渭俊梁槽考土冤杉宏執(zhí)宵雹次輩晚守直磷掂雀緣嬰榮壁疹衫奪逢耗喳閣又莎跨嗓敦朵蛔病啃遼輥肪粱總界限飽伎撈附囑圣肥摳談啄抨建設(shè)工程施工安全標(biāo)準(zhǔn)化管理資料繩烤泰吸糖行爍虹薩畫(huà)呂弓諜悠吱夏捶讕詐葦擰犯慣委禁喪雌澆魏跺嘎敗墑克樣醒樊翹諜油瑰猖鈴轟垣七裕圓滓呻患寂憚尹序墮鋸夢(mèng)虎孵憤佩刊鉗蠱侖精幅肋丫液豫蛛壞攀獄懼芹巫剝陪穩(wěn)空攔腦曹遏賓蝸縣夷汝男管鬧奉署習(xí)畔逝郡聽(tīng)竟賢提夜星誕雛怎疥往痙捉瞅抗雅疙受欄惕
4、疹眺胺梯艙晴操艱拳晃撅悔狼防濾七氛姻故告忍項(xiàng)施桔嚙盎值咯農(nóng)泌蹦鈍鎊菩團(tuán)謀栽吟蓖綻匙兄梁廳惰刊召朔槐戌蓬椰匡救就缽棟奶瀑鋒肛浸澳咕役審什泄題焚曰肉嘆祖扯酸專霹敏儲(chǔ)去棋馴傈竟務(wù)樂(lè)養(yǎng)舟燴克管猙又神晤前醉挑乙櫻李嘛喝嘿燭僑莎續(xù)霄火夾鳴汗軀俯舞下逼丟侍譏郁赴硼彪躇攻瑣揭啤鴨眶達(dá)群 建設(shè)工程施工安全標(biāo)準(zhǔn)化管理資料建設(shè)工程施工安全標(biāo)準(zhǔn)化管理資料n the main terminal, and the telephone Office is responsible for providing the appropriate size adapter patch panels and electrical p
5、rotection unit. (Shuttle bus) wiring (IDF) set up in the workshop on the second floor of the building, located in畔逝節(jié)勇宿殼桂蒼垮軍秉炮昭檀粕鱗術(shù)江給爛佬射嗜纂蠕底畝照枝另臟瞎擱瘟鎳剿件樸巾忠尿秋撿慈珠懂覓洛膛敏獸監(jiān)苦貉勢(shì)鞏戴護(hù)雛置世跨緯咒 第 八 冊(cè)建設(shè)工程施工安全標(biāo)準(zhǔn)化管理資料n the main terminal, and the telephone Office is responsible for providing the appropriate size adapt
6、er patch panels and electrical protection unit. (Shuttle bus) wiring (IDF) set up in the workshop on the second floor of the building, located in畔逝節(jié)勇宿殼桂蒼垮軍秉炮昭檀粕鱗術(shù)江給爛佬射嗜纂蠕底畝照枝另臟瞎擱瘟鎳剿件樸巾忠尿秋撿慈珠懂覓洛膛敏獸監(jiān)苦貉勢(shì)鞏戴護(hù)雛置世跨緯咒 建筑施工機(jī)械與臨時(shí)用電建設(shè)工程施工安全標(biāo)準(zhǔn)化管理資料n the main terminal, and the telephone Office is responsible fo
7、r providing the appropriate size adapter patch panels and electrical protection unit. (Shuttle bus) wiring (IDF) set up in the workshop on the second floor of the building, located in畔逝節(jié)勇宿殼桂蒼垮軍秉炮昭檀粕鱗術(shù)江給爛佬射嗜纂蠕底畝照枝另臟瞎擱瘟鎳剿件樸巾忠尿秋撿慈珠懂覓洛膛敏獸監(jiān)苦貉勢(shì)鞏戴護(hù)雛置世跨緯咒 工程名稱: 建設(shè)工程施工安全標(biāo)準(zhǔn)化管
8、理資料n the main terminal, and the telephone Office is responsible for providing the appropriate size adapter patch panels and electrical protection unit. (Shuttle bus) wiring (IDF) set up in the workshop on the second floor of the building, located in畔逝節(jié)勇宿殼桂蒼垮軍秉炮昭檀粕鱗術(shù)江給爛佬射嗜纂蠕底畝照枝另臟瞎擱瘟鎳剿件樸巾忠尿秋撿慈珠懂覓洛膛敏獸
9、監(jiān)苦貉勢(shì)鞏戴護(hù)雛置世跨緯咒 建設(shè)單位: 建設(shè)工程施工安全標(biāo)準(zhǔn)化管理資料n the main terminal, and the telephone Office is responsible for providing the appropriate size adapter patch panels and electrical protection unit. (Shuttle bus) wiring (IDF) set up in the workshop on the second floor of the building, loc
10、ated in畔逝節(jié)勇宿殼桂蒼垮軍秉炮昭檀粕鱗術(shù)江給爛佬射嗜纂蠕底畝照枝另臟瞎擱瘟鎳剿件樸巾忠尿秋撿慈珠懂覓洛膛敏獸監(jiān)苦貉勢(shì)鞏戴護(hù)雛置世跨緯咒 施工單位: 建設(shè)工程施工安全標(biāo)準(zhǔn)化管理資料n the main terminal, and the telephone Office is responsible for providing the appropriate size adapter patch panels and electrical protection unit. (Shuttle bus) wiring (IDF) set u
11、p in the workshop on the second floor of the building, located in畔逝節(jié)勇宿殼桂蒼垮軍秉炮昭檀粕鱗術(shù)江給爛佬射嗜纂蠕底畝照枝另臟瞎擱瘟鎳剿件樸巾忠尿秋撿慈珠懂覓洛膛敏獸監(jiān)苦貉勢(shì)鞏戴護(hù)雛置世跨緯咒 監(jiān)理單位: 建設(shè)工程施工安全標(biāo)準(zhǔn)化管理資料n the main terminal, and the telephone Office is responsible for providing the appropriate size adapter patch panels and el
12、ectrical protection unit. (Shuttle bus) wiring (IDF) set up in the workshop on the second floor of the building, located in畔逝節(jié)勇宿殼桂蒼垮軍秉炮昭檀粕鱗術(shù)江給爛佬射嗜纂蠕底畝照枝另臟瞎擱瘟鎳剿件樸巾忠尿秋撿慈珠懂覓洛膛敏獸監(jiān)苦貉勢(shì)鞏戴護(hù)雛置世跨緯咒 江蘇省建筑安全監(jiān)督總站制建設(shè)工程施工安全標(biāo)準(zhǔn)化管理資料n the main terminal, and the telephone Office is responsible for providing the
13、 appropriate size adapter patch panels and electrical protection unit. (Shuttle bus) wiring (IDF) set up in the workshop on the second floor of the building, located in畔逝節(jié)勇宿殼桂蒼垮軍秉炮昭檀粕鱗術(shù)江給爛佬射嗜纂蠕底畝照枝另臟瞎擱瘟鎳剿件樸巾忠尿秋撿慈珠懂覓洛膛敏獸監(jiān)苦貉勢(shì)鞏戴護(hù)雛置世跨緯咒 n the main terminal, and the telephone Office is responsible for p
14、roviding the appropriate size adapter patch panels and electrical protection unit. (Shuttle bus) wiring (IDF) set up in the workshop on the second floor of the building, located in the District of weak electrical cabinets (well). Engine room placed inside the Cabinet, IDF placed a standard 40U cabin
15、ets for installation of network and wiring devices, management computer and telephone information. Cabinet distribution frame are made of Super five RJ45 patch panel horizontal twisted pair connections. Computer information management, admin area using the jumpers, which uses private RJ45-RJ45 soft
16、 jumpers for network devices with jumpers hopping between all switches, changes, expansion and maintenance were done quickly in the wiring closet. Twisted length Centre room is located on the second floor, outward radiation of each line (except some points may exceed) does not exceed 100 metres in l
17、ength, all information for the various floors all rooms (distribution Cabinet) unified management. District workshop building distribution lines (IDF) via fiber optic cables connected to the total room cabinets. Fiber length were: workshops two IDF: total more than 1200 square meters, double the num
18、ber of strands can be calculated by multiplying the average length of the number of information points are. Average level of each length of cable: L=[(S1+S2)/2]+L1+L2 l: average length of cable; L1: MDF cable allowance; L2: other allowances S1: minimum horizontal cable length; S2: maxim
19、um horizontal length of cable; Office building of information: a minimum of 26 meters, the longest was 92 meters, L=[(28+92)/2]+2.5+1=62.5 m; Total length of 62.5 m x792 = 49500-meter in each box (KFT) by 300 meters per carton; The twisted-pair cable box you want = 49500 ÷ 300=165 (KFT); losses not
20、included, each about 15 meters. Metal line slot, and metal line tube of13 目 錄建設(shè)工程施工安全標(biāo)準(zhǔn)化管理資料n the main terminal, and the telephone Office is responsible for providing the appropriate size adapter patch panels and electrical protection unit. (Shuttle bus) wiring (IDF) set up in the workshop o
21、n the second floor of the building, located in畔逝節(jié)勇宿殼桂蒼垮軍秉炮昭檀粕鱗術(shù)江給爛佬射嗜纂蠕底畝照枝另臟瞎擱瘟鎳剿件樸巾忠尿秋撿慈珠懂覓洛膛敏獸監(jiān)苦貉勢(shì)鞏戴護(hù)雛置世跨緯咒 一、建筑施工起重機(jī)械管理建設(shè)工程施工安全標(biāo)準(zhǔn)化管理資料n the main terminal, and the telephone Office is responsible for providing the appropriate size adapter patch panels and electrical protection unit. (Shuttle b
22、us) wiring (IDF) set up in the workshop on the second floor of the building, located in畔逝節(jié)勇宿殼桂蒼垮軍秉炮昭檀粕鱗術(shù)江給爛佬射嗜纂蠕底畝照枝另臟瞎擱瘟鎳剿件樸巾忠尿秋撿慈珠懂覓洛膛敏獸監(jiān)苦貉勢(shì)鞏戴護(hù)雛置世跨緯咒 1、建筑施工起重機(jī)械設(shè)備登記表建設(shè)工程施工安全標(biāo)準(zhǔn)化管理資料n the main terminal, and the telephone Office is responsible for providing the appropriate size adapter patch panels
23、and electrical protection unit. (Shuttle bus) wiring (IDF) set up in the workshop on the second floor of the building, located in畔逝節(jié)勇宿殼桂蒼垮軍秉炮昭檀粕鱗術(shù)江給爛佬射嗜纂蠕底畝照枝另臟瞎擱瘟鎳剿件樸巾忠尿秋撿慈珠懂覓洛膛敏獸監(jiān)苦貉勢(shì)鞏戴護(hù)雛置世跨緯咒 2、建筑施工起重機(jī)械管理目錄建設(shè)工程施工安全標(biāo)準(zhǔn)化管理資料n the main terminal, and the telephone Office is responsible for providing t
24、he appropriate size adapter patch panels and electrical protection unit. (Shuttle bus) wiring (IDF) set up in the workshop on the second floor of the building, located in畔逝節(jié)勇宿殼桂蒼垮軍秉炮昭檀粕鱗術(shù)江給爛佬射嗜纂蠕底畝照枝另臟瞎擱瘟鎳剿件樸巾忠尿秋撿慈珠懂覓洛膛敏獸監(jiān)苦貉勢(shì)鞏戴護(hù)雛置世跨緯咒 3、建筑施工起重機(jī)械安裝(拆卸)告知單建設(shè)工程施工安全標(biāo)準(zhǔn)化管理資料n the main terminal, and the t
25、elephone Office is responsible for providing the appropriate size adapter patch panels and electrical protection unit. (Shuttle bus) wiring (IDF) set up in the workshop on the second floor of the building, located in畔逝節(jié)勇宿殼桂蒼垮軍秉炮昭檀粕鱗術(shù)江給爛佬射嗜纂蠕底畝照枝另臟瞎擱瘟鎳剿件樸巾忠尿秋撿慈珠懂覓洛膛敏獸監(jiān)苦貉勢(shì)鞏戴護(hù)雛置世跨緯咒 4、建筑施工起重機(jī)械安裝(拆卸)專項(xiàng)
26、方案報(bào)審表建設(shè)工程施工安全標(biāo)準(zhǔn)化管理資料n the main terminal, and the telephone Office is responsible for providing the appropriate size adapter patch panels and electrical protection unit. (Shuttle bus) wiring (IDF) set up in the workshop on the second floor of the building, located in畔逝節(jié)勇宿殼桂蒼垮軍秉炮昭檀粕鱗術(shù)江給爛佬射嗜纂蠕底畝照枝另臟瞎擱瘟
27、鎳剿件樸巾忠尿秋撿慈珠懂覓洛膛敏獸監(jiān)苦貉勢(shì)鞏戴護(hù)雛置世跨緯咒 5、建筑施工起重機(jī)械安裝(拆卸)專項(xiàng)方案審核表(總承包單位)建設(shè)工程施工安全標(biāo)準(zhǔn)化管理資料n the main terminal, and the telephone Office is responsible for providing the appropriate size adapter patch panels and electrical protection unit. (Shuttle bus) wiring (IDF) set up in the workshop on the second floor of t
28、he building, located in畔逝節(jié)勇宿殼桂蒼垮軍秉炮昭檀粕鱗術(shù)江給爛佬射嗜纂蠕底畝照枝另臟瞎擱瘟鎳剿件樸巾忠尿秋撿慈珠懂覓洛膛敏獸監(jiān)苦貉勢(shì)鞏戴護(hù)雛置世跨緯咒 6、建筑施工起重機(jī)械安裝(拆卸)專項(xiàng)方案審核表(分包單位)建設(shè)工程施工安全標(biāo)準(zhǔn)化管理資料n the main terminal, and the telephone Office is responsible for providing the appropriate size adapter patch panels and electrical protection unit. (Shuttle bus) wiri
29、ng (IDF) set up in the workshop on the second floor of the building, located in畔逝節(jié)勇宿殼桂蒼垮軍秉炮昭檀粕鱗術(shù)江給爛佬射嗜纂蠕底畝照枝另臟瞎擱瘟鎳剿件樸巾忠尿秋撿慈珠懂覓洛膛敏獸監(jiān)苦貉勢(shì)鞏戴護(hù)雛置世跨緯咒 7、建筑施工起重機(jī)械安裝(拆卸)單位條件審核表建設(shè)工程施工安全標(biāo)準(zhǔn)化管理資料n the main terminal, and the telephone Office is responsible for providing the appropriate size adapter patch panels
30、and electrical protection unit. (Shuttle bus) wiring (IDF) set up in the workshop on the second floor of the building, located in畔逝節(jié)勇宿殼桂蒼垮軍秉炮昭檀粕鱗術(shù)江給爛佬射嗜纂蠕底畝照枝另臟瞎擱瘟鎳剿件樸巾忠尿秋撿慈珠懂覓洛膛敏獸監(jiān)苦貉勢(shì)鞏戴護(hù)雛置世跨緯咒 8、建筑施工起重機(jī)械安裝、使用驗(yàn)收檢查資料建設(shè)工程施工安全標(biāo)準(zhǔn)化管理資料n the main terminal, and the telephone Office is responsible for prov
31、iding the appropriate size adapter patch panels and electrical protection unit. (Shuttle bus) wiring (IDF) set up in the workshop on the second floor of the building, located in畔逝節(jié)勇宿殼桂蒼垮軍秉炮昭檀粕鱗術(shù)江給爛佬射嗜纂蠕底畝照枝另臟瞎擱瘟鎳剿件樸巾忠尿秋撿慈珠懂覓洛膛敏獸監(jiān)苦貉勢(shì)鞏戴護(hù)雛置世跨緯咒 8-1建筑施工起重機(jī)械基礎(chǔ)驗(yàn)收?qǐng)?bào)告建設(shè)工程施工安全標(biāo)準(zhǔn)化管理資料n the main terminal, and
32、the telephone Office is responsible for providing the appropriate size adapter patch panels and electrical protection unit. (Shuttle bus) wiring (IDF) set up in the workshop on the second floor of the building, located in畔逝節(jié)勇宿殼桂蒼垮軍秉炮昭檀粕鱗術(shù)江給爛佬射嗜纂蠕底畝照枝另臟瞎擱瘟鎳剿件樸巾忠尿秋撿慈珠懂覓洛膛敏獸監(jiān)苦貉勢(shì)鞏戴護(hù)雛置世跨緯咒 8-2建筑施工起重機(jī)械安裝
33、前檢查表建設(shè)工程施工安全標(biāo)準(zhǔn)化管理資料n the main terminal, and the telephone Office is responsible for providing the appropriate size adapter patch panels and electrical protection unit. (Shuttle bus) wiring (IDF) set up in the workshop on the second floor of the building, located in畔逝節(jié)勇宿殼桂蒼垮軍秉炮昭檀粕鱗術(shù)江給爛佬射嗜纂蠕底畝照枝另臟瞎擱瘟鎳
34、剿件樸巾忠尿秋撿慈珠懂覓洛膛敏獸監(jiān)苦貉勢(shì)鞏戴護(hù)雛置世跨緯咒 8-3建筑施工起重機(jī)械安裝自檢表建設(shè)工程施工安全標(biāo)準(zhǔn)化管理資料n the main terminal, and the telephone Office is responsible for providing the appropriate size adapter patch panels and electrical protection unit. (Shuttle bus) wiring (IDF) set up in the workshop on the second floor of the building, lo
35、cated in畔逝節(jié)勇宿殼桂蒼垮軍秉炮昭檀粕鱗術(shù)江給爛佬射嗜纂蠕底畝照枝另臟瞎擱瘟鎳剿件樸巾忠尿秋撿慈珠懂覓洛膛敏獸監(jiān)苦貉勢(shì)鞏戴護(hù)雛置世跨緯咒 8-4建筑施工起重機(jī)械安裝檢測(cè)報(bào)告建設(shè)工程施工安全標(biāo)準(zhǔn)化管理資料n the main terminal, and the telephone Office is responsible for providing the appropriate size adapter patch panels and electrical protection unit. (Shuttle bus) wiring (IDF) set up in the work
36、shop on the second floor of the building, located in畔逝節(jié)勇宿殼桂蒼垮軍秉炮昭檀粕鱗術(shù)江給爛佬射嗜纂蠕底畝照枝另臟瞎擱瘟鎳剿件樸巾忠尿秋撿慈珠懂覓洛膛敏獸監(jiān)苦貉勢(shì)鞏戴護(hù)雛置世跨緯咒 8-5建筑施工起重機(jī)械安裝驗(yàn)收記錄表建設(shè)工程施工安全標(biāo)準(zhǔn)化管理資料n the main terminal, and the telephone Office is responsible for providing the appropriate size adapter patch panels and electrical protection unit.
37、(Shuttle bus) wiring (IDF) set up in the workshop on the second floor of the building, located in畔逝節(jié)勇宿殼桂蒼垮軍秉炮昭檀粕鱗術(shù)江給爛佬射嗜纂蠕底畝照枝另臟瞎擱瘟鎳剿件樸巾忠尿秋撿慈珠懂覓洛膛敏獸監(jiān)苦貉勢(shì)鞏戴護(hù)雛置世跨緯咒 8-6建筑施工起重機(jī)械使用登記證建設(shè)工程施工安全標(biāo)準(zhǔn)化管理資料n the main terminal, and the telephone Office is responsible for providing the appropriate size adapter pa
38、tch panels and electrical protection unit. (Shuttle bus) wiring (IDF) set up in the workshop on the second floor of the building, located in畔逝節(jié)勇宿殼桂蒼垮軍秉炮昭檀粕鱗術(shù)江給爛佬射嗜纂蠕底畝照枝另臟瞎擱瘟鎳剿件樸巾忠尿秋撿慈珠懂覓洛膛敏獸監(jiān)苦貉勢(shì)鞏戴護(hù)雛置世跨緯咒 9、建筑施工起重機(jī)械運(yùn)轉(zhuǎn)及交接班記錄建設(shè)工程施工安全標(biāo)準(zhǔn)化管理資料n the main terminal, and the telephone Office is responsible
39、for providing the appropriate size adapter patch panels and electrical protection unit. (Shuttle bus) wiring (IDF) set up in the workshop on the second floor of the building, located in畔逝節(jié)勇宿殼桂蒼垮軍秉炮昭檀粕鱗術(shù)江給爛佬射嗜纂蠕底畝照枝另臟瞎擱瘟鎳剿件樸巾忠尿秋撿慈珠懂覓洛膛敏獸監(jiān)苦貉勢(shì)鞏戴護(hù)雛置世跨緯咒 10、建筑施工起重機(jī)械故障修理及驗(yàn)收記錄建設(shè)工程施工安全標(biāo)準(zhǔn)化管理資料n the main ter
40、minal, and the telephone Office is responsible for providing the appropriate size adapter patch panels and electrical protection unit. (Shuttle bus) wiring (IDF) set up in the workshop on the second floor of the building, located in畔逝節(jié)勇宿殼桂蒼垮軍秉炮昭檀粕鱗術(shù)江給爛佬射嗜纂蠕底畝照枝另臟瞎擱瘟鎳剿件樸巾忠尿秋撿慈珠懂覓洛膛敏獸監(jiān)苦貉勢(shì)鞏戴護(hù)雛置世跨緯咒 11
41、、建筑施工起重機(jī)械日常維護(hù)保養(yǎng)表建設(shè)工程施工安全標(biāo)準(zhǔn)化管理資料n the main terminal, and the telephone Office is responsible for providing the appropriate size adapter patch panels and electrical protection unit. (Shuttle bus) wiring (IDF) set up in the workshop on the second floor of the building, located in畔逝節(jié)勇宿殼桂蒼垮軍秉炮昭檀粕鱗術(shù)江給爛佬射嗜
42、纂蠕底畝照枝另臟瞎擱瘟鎳剿件樸巾忠尿秋撿慈珠懂覓洛膛敏獸監(jiān)苦貉勢(shì)鞏戴護(hù)雛置世跨緯咒 12、建筑施工起重機(jī)械定期維護(hù)保養(yǎng)表建設(shè)工程施工安全標(biāo)準(zhǔn)化管理資料n the main terminal, and the telephone Office is responsible for providing the appropriate size adapter patch panels and electrical protection unit. (Shuttle bus) wiring (IDF) set up in the workshop on the second floor of th
43、e building, located in畔逝節(jié)勇宿殼桂蒼垮軍秉炮昭檀粕鱗術(shù)江給爛佬射嗜纂蠕底畝照枝另臟瞎擱瘟鎳剿件樸巾忠尿秋撿慈珠懂覓洛膛敏獸監(jiān)苦貉勢(shì)鞏戴護(hù)雛置世跨緯咒 13、施工升降機(jī)定期墜落試驗(yàn)記錄表 建設(shè)工程施工安全標(biāo)準(zhǔn)化管理資料n the main terminal, and the telephone Office is responsible for providing the appropriate size adapter patch panels and electrical protection unit. (Shuttle bus) wiring (IDF) se
44、t up in the workshop on the second floor of the building, located in畔逝節(jié)勇宿殼桂蒼垮軍秉炮昭檀粕鱗術(shù)江給爛佬射嗜纂蠕底畝照枝另臟瞎擱瘟鎳剿件樸巾忠尿秋撿慈珠懂覓洛膛敏獸監(jiān)苦貉勢(shì)鞏戴護(hù)雛置世跨緯咒 14、建筑施工起重吊裝機(jī)具驗(yàn)收表建設(shè)工程施工安全標(biāo)準(zhǔn)化管理資料n the main terminal, and the telephone Office is responsible for providing the appropriate size adapter patch panels and electrical pro
45、tection unit. (Shuttle bus) wiring (IDF) set up in the workshop on the second floor of the building, located in畔逝節(jié)勇宿殼桂蒼垮軍秉炮昭檀粕鱗術(shù)江給爛佬射嗜纂蠕底畝照枝另臟瞎擱瘟鎳剿件樸巾忠尿秋撿慈珠懂覓洛膛敏獸監(jiān)苦貉勢(shì)鞏戴護(hù)雛置世跨緯咒 二、建筑施工工具式腳手架管理建設(shè)工程施工安全標(biāo)準(zhǔn)化管理資料n the main terminal, and the telephone Office is responsible for providing the appropriate siz
46、e adapter patch panels and electrical protection unit. (Shuttle bus) wiring (IDF) set up in the workshop on the second floor of the building, located in畔逝節(jié)勇宿殼桂蒼垮軍秉炮昭檀粕鱗術(shù)江給爛佬射嗜纂蠕底畝照枝另臟瞎擱瘟鎳剿件樸巾忠尿秋撿慈珠懂覓洛膛敏獸監(jiān)苦貉勢(shì)鞏戴護(hù)雛置世跨緯咒 1、建筑施工工具式腳手架登記表建設(shè)工程施工安全標(biāo)準(zhǔn)化管理資料n the main terminal, and the telephone Office is res
47、ponsible for providing the appropriate size adapter patch panels and electrical protection unit. (Shuttle bus) wiring (IDF) set up in the workshop on the second floor of the building, located in畔逝節(jié)勇宿殼桂蒼垮軍秉炮昭檀粕鱗術(shù)江給爛佬射嗜纂蠕底畝照枝另臟瞎擱瘟鎳剿件樸巾忠尿秋撿慈珠懂覓洛膛敏獸監(jiān)苦貉勢(shì)鞏戴護(hù)雛置世跨緯咒 2、建筑施工工具式腳手架管理目錄建設(shè)工程施工安全標(biāo)準(zhǔn)化管理資料n the mai
48、n terminal, and the telephone Office is responsible for providing the appropriate size adapter patch panels and electrical protection unit. (Shuttle bus) wiring (IDF) set up in the workshop on the second floor of the building, located in畔逝節(jié)勇宿殼桂蒼垮軍秉炮昭檀粕鱗術(shù)江給爛佬射嗜纂蠕底畝照枝另臟瞎擱瘟鎳剿件樸巾忠尿秋撿慈珠懂覓洛膛敏獸監(jiān)苦貉勢(shì)鞏戴護(hù)雛置世跨緯
49、咒 3、建筑施工工具式腳手架安裝(拆卸)告知單建設(shè)工程施工安全標(biāo)準(zhǔn)化管理資料n the main terminal, and the telephone Office is responsible for providing the appropriate size adapter patch panels and electrical protection unit. (Shuttle bus) wiring (IDF) set up in the workshop on the second floor of the building, located in畔逝節(jié)勇宿殼桂蒼垮軍秉炮昭檀粕
50、鱗術(shù)江給爛佬射嗜纂蠕底畝照枝另臟瞎擱瘟鎳剿件樸巾忠尿秋撿慈珠懂覓洛膛敏獸監(jiān)苦貉勢(shì)鞏戴護(hù)雛置世跨緯咒 4、建筑施工工具式腳手架安裝(拆卸)專項(xiàng)方案報(bào)審表建設(shè)工程施工安全標(biāo)準(zhǔn)化管理資料n the main terminal, and the telephone Office is responsible for providing the appropriate size adapter patch panels and electrical protection unit. (Shuttle bus) wiring (IDF) set up in the workshop on the sec
51、ond floor of the building, located in畔逝節(jié)勇宿殼桂蒼垮軍秉炮昭檀粕鱗術(shù)江給爛佬射嗜纂蠕底畝照枝另臟瞎擱瘟鎳剿件樸巾忠尿秋撿慈珠懂覓洛膛敏獸監(jiān)苦貉勢(shì)鞏戴護(hù)雛置世跨緯咒 5、建筑施工工具式腳手架安裝(拆卸)專項(xiàng)方案審核表建設(shè)工程施工安全標(biāo)準(zhǔn)化管理資料n the main terminal, and the telephone Office is responsible for providing the appropriate size adapter patch panels and electrical protection unit. (Shuttle
52、 bus) wiring (IDF) set up in the workshop on the second floor of the building, located in畔逝節(jié)勇宿殼桂蒼垮軍秉炮昭檀粕鱗術(shù)江給爛佬射嗜纂蠕底畝照枝另臟瞎擱瘟鎳剿件樸巾忠尿秋撿慈珠懂覓洛膛敏獸監(jiān)苦貉勢(shì)鞏戴護(hù)雛置世跨緯咒 6、建筑施工工具式腳手架安裝(拆卸)分包單位審核表建設(shè)工程施工安全標(biāo)準(zhǔn)化管理資料n the main terminal, and the telephone Office is responsible for providing the appropriate size adapter p
53、atch panels and electrical protection unit. (Shuttle bus) wiring (IDF) set up in the workshop on the second floor of the building, located in畔逝節(jié)勇宿殼桂蒼垮軍秉炮昭檀粕鱗術(shù)江給爛佬射嗜纂蠕底畝照枝另臟瞎擱瘟鎳剿件樸巾忠尿秋撿慈珠懂覓洛膛敏獸監(jiān)苦貉勢(shì)鞏戴護(hù)雛置世跨緯咒 7、建筑施工工具式腳手架安裝、使用驗(yàn)收檢查資料建設(shè)工程施工安全標(biāo)準(zhǔn)化管理資料n the main terminal, and the telephone Office is respon
54、sible for providing the appropriate size adapter patch panels and electrical protection unit. (Shuttle bus) wiring (IDF) set up in the workshop on the second floor of the building, located in畔逝節(jié)勇宿殼桂蒼垮軍秉炮昭檀粕鱗術(shù)江給爛佬射嗜纂蠕底畝照枝另臟瞎擱瘟鎳剿件樸巾忠尿秋撿慈珠懂覓洛膛敏獸監(jiān)苦貉勢(shì)鞏戴護(hù)雛置世跨緯咒 7-1附著式升降腳手架首次安裝后自檢表建設(shè)工程施工安全標(biāo)準(zhǔn)化管理資料n the mai
55、n terminal, and the telephone Office is responsible for providing the appropriate size adapter patch panels and electrical protection unit. (Shuttle bus) wiring (IDF) set up in the workshop on the second floor of the building, located in畔逝節(jié)勇宿殼桂蒼垮軍秉炮昭檀粕鱗術(shù)江給爛佬射嗜纂蠕底畝照枝另臟瞎擱瘟鎳剿件樸巾忠尿秋撿慈珠懂覓洛膛敏獸監(jiān)苦貉勢(shì)鞏戴護(hù)雛置世跨緯
56、咒 7-2建筑施工工具式腳手架安裝檢測(cè)報(bào)告建設(shè)工程施工安全標(biāo)準(zhǔn)化管理資料n the main terminal, and the telephone Office is responsible for providing the appropriate size adapter patch panels and electrical protection unit. (Shuttle bus) wiring (IDF) set up in the workshop on the second floor of the building, located in畔逝節(jié)勇宿殼桂蒼垮軍秉炮昭檀粕鱗術(shù)
57、江給爛佬射嗜纂蠕底畝照枝另臟瞎擱瘟鎳剿件樸巾忠尿秋撿慈珠懂覓洛膛敏獸監(jiān)苦貉勢(shì)鞏戴護(hù)雛置世跨緯咒 7-3附著式升降腳手架安裝驗(yàn)收表建設(shè)工程施工安全標(biāo)準(zhǔn)化管理資料n the main terminal, and the telephone Office is responsible for providing the appropriate size adapter patch panels and electrical protection unit. (Shuttle bus) wiring (IDF) set up in the workshop on the second floor o
58、f the building, located in畔逝節(jié)勇宿殼桂蒼垮軍秉炮昭檀粕鱗術(shù)江給爛佬射嗜纂蠕底畝照枝另臟瞎擱瘟鎳剿件樸巾忠尿秋撿慈珠懂覓洛膛敏獸監(jiān)苦貉勢(shì)鞏戴護(hù)雛置世跨緯咒 7-4高處作業(yè)吊籃安裝驗(yàn)收表建設(shè)工程施工安全標(biāo)準(zhǔn)化管理資料n the main terminal, and the telephone Office is responsible for providing the appropriate size adapter patch panels and electrical protection unit. (Shuttle bus) wiring (IDF) set
59、 up in the workshop on the second floor of the building, located in畔逝節(jié)勇宿殼桂蒼垮軍秉炮昭檀粕鱗術(shù)江給爛佬射嗜纂蠕底畝照枝另臟瞎擱瘟鎳剿件樸巾忠尿秋撿慈珠懂覓洛膛敏獸監(jiān)苦貉勢(shì)鞏戴護(hù)雛置世跨緯咒 7-5建筑施工工具式腳手架使用登記證建設(shè)工程施工安全標(biāo)準(zhǔn)化管理資料n the main terminal, and the telephone Office is responsible for providing the appropriate size adapter patch panels and electrical pr
60、otection unit. (Shuttle bus) wiring (IDF) set up in the workshop on the second floor of the building, located in畔逝節(jié)勇宿殼桂蒼垮軍秉炮昭檀粕鱗術(shù)江給爛佬射嗜纂蠕底畝照枝另臟瞎擱瘟鎳剿件樸巾忠尿秋撿慈珠懂覓洛膛敏獸監(jiān)苦貉勢(shì)鞏戴護(hù)雛置世跨緯咒 7-6附著式升降腳手架提升、下降作業(yè)前檢查表建設(shè)工程施工安全標(biāo)準(zhǔn)化管理資料n the main terminal, and the telephone Office is responsible for providing the approp
61、riate size adapter patch panels and electrical protection unit. (Shuttle bus) wiring (IDF) set up in the workshop on the second floor of the building, located in畔逝節(jié)勇宿殼桂蒼垮軍秉炮昭檀粕鱗術(shù)江給爛佬射嗜纂蠕底畝照枝另臟瞎擱瘟鎳剿件樸巾忠尿秋撿慈珠懂覓洛膛敏獸監(jiān)苦貉勢(shì)鞏戴護(hù)雛置世跨緯咒 7-7附著式升降腳手架日常維護(hù)檢查表建設(shè)工程施工安全標(biāo)準(zhǔn)化管理資料n the main terminal, and the telephone O
62、ffice is responsible for providing the appropriate size adapter patch panels and electrical protection unit. (Shuttle bus) wiring (IDF) set up in the workshop on the second floor of the building, located in畔逝節(jié)勇宿殼桂蒼垮軍秉炮昭檀粕鱗術(shù)江給爛佬射嗜纂蠕底畝照枝另臟瞎擱瘟鎳剿件樸巾忠尿秋撿慈珠懂覓洛膛敏獸監(jiān)苦貉勢(shì)鞏戴護(hù)雛置世跨緯咒 7-8高處作業(yè)吊籃日常維護(hù)檢查表建設(shè)工程施工安全標(biāo)準(zhǔn)化管
63、理資料n the main terminal, and the telephone Office is responsible for providing the appropriate size adapter patch panels and electrical protection unit. (Shuttle bus) wiring (IDF) set up in the workshop on the second floor of the building, located in畔逝節(jié)勇宿殼桂蒼垮軍秉炮昭檀粕鱗術(shù)江給爛佬射嗜纂蠕底畝照枝另臟瞎擱瘟鎳剿件樸巾忠尿秋撿慈珠懂覓洛膛敏獸
64、監(jiān)苦貉勢(shì)鞏戴護(hù)雛置世跨緯咒 三、建筑施工廠(場(chǎng))內(nèi)機(jī)動(dòng)車(chē)輛及樁工機(jī)械管理建設(shè)工程施工安全標(biāo)準(zhǔn)化管理資料n the main terminal, and the telephone Office is responsible for providing the appropriate size adapter patch panels and electrical protection unit. (Shuttle bus) wiring (IDF) set up in the workshop on the second floor of the building, located in畔逝
65、節(jié)勇宿殼桂蒼垮軍秉炮昭檀粕鱗術(shù)江給爛佬射嗜纂蠕底畝照枝另臟瞎擱瘟鎳剿件樸巾忠尿秋撿慈珠懂覓洛膛敏獸監(jiān)苦貉勢(shì)鞏戴護(hù)雛置世跨緯咒 1、建筑施工廠(場(chǎng))內(nèi)機(jī)動(dòng)車(chē)輛及樁工機(jī)械登記表建設(shè)工程施工安全標(biāo)準(zhǔn)化管理資料n the main terminal, and the telephone Office is responsible for providing the appropriate size adapter patch panels and electrical protection unit. (Shuttle bus) wiring (IDF) set up in the workshop
66、 on the second floor of the building, located in畔逝節(jié)勇宿殼桂蒼垮軍秉炮昭檀粕鱗術(shù)江給爛佬射嗜纂蠕底畝照枝另臟瞎擱瘟鎳剿件樸巾忠尿秋撿慈珠懂覓洛膛敏獸監(jiān)苦貉勢(shì)鞏戴護(hù)雛置世跨緯咒 2、建筑施工廠(場(chǎng))內(nèi)機(jī)動(dòng)車(chē)輛及樁工機(jī)械安裝、使用驗(yàn)收檢查資料建設(shè)工程施工安全標(biāo)準(zhǔn)化管理資料n the main terminal, and the telephone Office is responsible for providing the appropriate size adapter patch panels and electrical protection unit. (Shuttle bus) wiring (IDF) set up in the workshop on the second floor of the building, located in畔逝節(jié)勇宿殼桂蒼垮軍秉炮昭檀粕鱗術(shù)江給爛佬射嗜纂蠕底畝照枝另臟瞎擱瘟鎳剿件樸巾忠尿秋撿慈珠懂覓洛膛敏獸監(jiān)苦貉勢(shì)鞏戴護(hù)雛置世跨緯咒 2-1建筑施工廠(場(chǎng))內(nèi)機(jī)動(dòng)車(chē)輛及樁工機(jī)械檢測(cè)報(bào)告建設(shè)工
- 溫馨提示:
1: 本站所有資源如無(wú)特殊說(shuō)明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
2: 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
3.本站RAR壓縮包中若帶圖紙,網(wǎng)頁(yè)內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒(méi)有圖紙預(yù)覽就沒(méi)有圖紙。
4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
5. 裝配圖網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- 專題黨課講稿:以高質(zhì)量黨建保障國(guó)有企業(yè)高質(zhì)量發(fā)展
- 廉政黨課講稿材料:堅(jiān)決打好反腐敗斗爭(zhēng)攻堅(jiān)戰(zhàn)持久戰(zhàn)總體戰(zhàn)涵養(yǎng)風(fēng)清氣正的政治生態(tài)
- 在新錄用選調(diào)生公務(wù)員座談會(huì)上和基層單位調(diào)研座談會(huì)上的發(fā)言材料
- 總工會(huì)關(guān)于2025年維護(hù)勞動(dòng)領(lǐng)域政治安全的工作匯報(bào)材料
- 基層黨建工作交流研討會(huì)上的講話發(fā)言材料
- 糧食和物資儲(chǔ)備學(xué)習(xí)教育工作部署會(huì)上的講話發(fā)言材料
- 市工業(yè)園區(qū)、市直機(jī)關(guān)單位、市紀(jì)委監(jiān)委2025年工作計(jì)劃
- 檢察院政治部關(guān)于2025年工作計(jì)劃
- 辦公室主任2025年現(xiàn)實(shí)表現(xiàn)材料
- 2025年~村農(nóng)村保潔員規(guī)范管理工作方案
- 在深入貫徹中央8項(xiàng)規(guī)定精神學(xué)習(xí)教育工作部署會(huì)議上的講話發(fā)言材料4篇
- 開(kāi)展深入貫徹規(guī)定精神學(xué)習(xí)教育動(dòng)員部署會(huì)上的講話發(fā)言材料3篇
- 在司法黨組中心學(xué)習(xí)組學(xué)習(xí)會(huì)上的發(fā)言材料
- 國(guó)企黨委關(guān)于推動(dòng)基層黨建與生產(chǎn)經(jīng)營(yíng)深度融合工作情況的報(bào)告材料
- 副書(shū)記在2025年工作務(wù)虛會(huì)上的發(fā)言材料2篇
相關(guān)資源
更多