成莊煤礦300萬噸新井設計【含CAD圖紙+文檔】
成莊煤礦300萬噸新井設計【含CAD圖紙+文檔】,含CAD圖紙+文檔,煤礦,萬噸新井,設計,cad,圖紙,文檔
摘 要
本設計礦井的井田面積為29.96平方千米,年產量300萬噸。井田內煤層賦存比較穩(wěn)定,煤層傾角,平均3°,煤層厚度平均8.0m。井田范圍內整體地質條件比較簡單,斷層較發(fā)育,但均是小斷層。礦井瓦斯含量較高,為高瓦斯礦井,礦井涌水量不大。根據(jù)實際的地質資料情況進行井田開拓和準備方式的初步設計,該礦井決定采用雙斜井兩水平上下山開采,采用帶區(qū)式開拓方式。設計采用綜合機械化放頂煤回采工藝,傾斜長壁采煤法,用全部跨落法處理采空區(qū),并對礦井運輸、提升、排水和通風等各個生產系統(tǒng)的設備選型計算,以及對礦井安全技術措施和環(huán)境保護提出要求,完成了整個礦井的初步設計。礦井全部實現(xiàn)機械化,采用先進技術和借鑒已實現(xiàn)高產高效現(xiàn)代化礦井的經驗,實現(xiàn)一礦一面高產高效礦井從而達到良好的經濟效益和社會效益。
關鍵詞:傾斜長壁 放頂煤 綜合機械化 高產高效
Abstract
These designed allotment area for 29.96 square kilometers,Yearly Output three-hundred trillion. Allotment intrinsically ocurrence of coal seam compare stabilize,coal seam pitch is under fifteen acid,average coal seam pitch is three acid.Coal seam thick is 8.0m,integrally nature condition compare simplicity,at allotment scope east normalizing function of the stomach and pleen center equal have got dislocation upgrowth. Both methane and carbon dioxide content relatively do not high, and neither do inflow of water no large either. On the basis of Preliminary Design,said shaft opt in adopt three vertical shaft fluctuate mountain exploitation,coal seam grouping band region fluctuate mountain co- disposal 'mode of opening,design adopt comprehensive mechanization full-seam mining stopper art,incline longwall method,treat goaf with whole straddle alight law from actual geologic information instance proceed allotment exploit and stand-by mode. The Preliminary Design of the both both combine versus mine haul, shaft exaltation, shaft drain and ventilation of mines isopuant systemic equipment lectotype count,as well as versus shaft technical safety measures and environmental protection claim,complete wholly shaft. Both shaft whole realize mechanization,adopt advanced techniques and use for reference afterwards realize high yield highly active modernization shaft 'experience,realize one mine not both high yield highly active shaft thereby run up to favorable economic benefit and social benefit.
Keyword:incline length wall full-seam mining comprehensive mechanization high yield highly active
1
收藏
編號:1737053
類型:共享資源
大?。?span id="mzebxcnn0" class="font-tahoma">6.55MB
格式:ZIP
上傳時間:2019-11-04
50
積分
- 關 鍵 詞:
-
含CAD圖紙+文檔
煤礦
萬噸新井
設計
cad
圖紙
文檔
- 資源描述:
-
成莊煤礦300萬噸新井設計【含CAD圖紙+文檔】,含CAD圖紙+文檔,煤礦,萬噸新井,設計,cad,圖紙,文檔
展開閱讀全文
- 溫馨提示:
1: 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
2: 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權益歸上傳用戶所有。
3.本站RAR壓縮包中若帶圖紙,網(wǎng)頁內容里面會有圖紙預覽,若沒有圖紙預覽就沒有圖紙。
4. 未經權益所有人同意不得將文件中的內容挪作商業(yè)或盈利用途。
5. 裝配圖網(wǎng)僅提供信息存儲空間,僅對用戶上傳內容的表現(xiàn)方式做保護處理,對用戶上傳分享的文檔內容本身不做任何修改或編輯,并不能對任何下載內容負責。
6. 下載文件中如有侵權或不適當內容,請與我們聯(lián)系,我們立即糾正。
7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
裝配圖網(wǎng)所有資源均是用戶自行上傳分享,僅供網(wǎng)友學習交流,未經上傳用戶書面授權,請勿作他用。