祁東煤礦3.0Mt/a新井設(shè)計(jì)
摘 要
本設(shè)計(jì)包括三個(gè)部分:一般部分、專題部分和翻譯部分。
一般部分為祁煤礦3.0 Mt/a新井設(shè)計(jì)。一般部分共包括10章:1.礦區(qū)概況與井田地質(zhì)特征;2.井田境界和儲(chǔ)量;3.礦井工作制度和設(shè)計(jì)生產(chǎn)能力及服務(wù)年限;4.井田開(kāi)拓;5.準(zhǔn)備方式―采區(qū)巷道布置;6.采煤方法;7.井下運(yùn)輸;8.礦井提升;9.礦井通風(fēng)及安全;10. 礦井基本技術(shù)經(jīng)濟(jì)指標(biāo)。
祁東煤礦位于安徽省宿州市東南,京滬鐵路西側(cè),井田中心距宿州市約20km,交通便利。井田形狀近似長(zhǎng)方形,東西長(zhǎng)約9 km,南北寬約3.0 km,面積約24 km2。井田內(nèi)開(kāi)采61煤層和71煤層,先采61,做為解放層開(kāi)采,后開(kāi)采71煤。煤層傾角12~15°,平均12、3°。煤層平均厚度61煤層7.5 m,71煤7.0 m。井田地質(zhì)條件較為簡(jiǎn)單。
礦井工業(yè)儲(chǔ)量為330.2297Mt,可采儲(chǔ)量為220.6853Mt。礦井設(shè)計(jì)生產(chǎn)能力為3.0Mt/a。礦井服務(wù)年限61.3 a。礦井涌水量不大,正常涌水量為436m3/h,最大涌水量為586 m3/h。61煤相對(duì)瓦斯涌出量為10 m3/t,屬高瓦斯煤層。礦井煤塵無(wú)爆炸危險(xiǎn)性,煤層不易自燃,自然發(fā)火等級(jí)為Ⅲ級(jí)。
礦井采用暗斜井兩水平開(kāi)拓,下行開(kāi)采。一礦一面,采煤方法為綜合機(jī)械化放頂煤開(kāi)采。全礦采用膠帶運(yùn)輸機(jī)運(yùn)煤,輔助運(yùn)輸前期采用1.5 t固定箱礦車(chē),后期采用齒軌車(chē)運(yùn)輸。礦井通風(fēng)方式前后期均為為采區(qū)式通風(fēng)。
礦井年工作日為330 d,日凈提升時(shí)間16 h,工作制度為“四六制”。
專題部分題目是煤炭地下氣化開(kāi)采技術(shù)基礎(chǔ)研究。以一些煤礦工程實(shí)例為例,通過(guò)建立模型進(jìn)行分析計(jì)算,研究了煤炭地下氣化過(guò)程中頂板巖層移動(dòng)特征、煤炭地下氣化過(guò)程中半焦孔隙結(jié)構(gòu)的變化規(guī)律以及煤炭地下氣化過(guò)程中覆巖應(yīng)力場(chǎng)的數(shù)值,得出關(guān)于以上三方面的相關(guān)結(jié)論。
翻譯部分是一篇關(guān)于煤層氣恢復(fù)技術(shù)的論文,英文題目為
Simulation of CO2-geosequestration enhanced coal bed methane recovery with a deformation-flow coupled model
關(guān)鍵詞:新井設(shè)計(jì);綜合機(jī)械化放頂煤開(kāi)采;采區(qū)式通風(fēng);立井開(kāi)拓;采區(qū)
ABSTRACT
This design includes three parts: the general part, special subject part and translation part.
The general part is a new design of Qidong mine. This design includes ten chapters: 1.An outline of the mine field geology; 2.Boundary and the reserves of mine; 3.The service life and working system of mine; 4.Development engineering of coalfield; 5.The layout of mining area; 6.The method used in coal mining; 7. Transportation of the underground; 8.The lifting of the mine; 9. The ventilation and the safety operation of the mine; 10.The basic economic and technical norms.
The Qidong mine locates at the crosspart of Qixian, Xisipo and Guzhen of Suzhou in Anhui province, 20 km away from the center of the town. And the transportation is very convenience. The shape of minefield is like a rectangle which has a length of 9 km in the east and west and a width of 3 km in the south and north on average. The total plane area of the mine is about 24 km2. There are two coal seams in the mine —NO.61 and NO. 71. Mining the NO.61 coal seam firstly.The angle is about 9.05~13.8 degree with an average of 12 and the thickness of both coal seams is about 7.0 m. The minefield geological condition is simple.
The proved reserves of the minefield are 330.2297 million tons. The recoverable reserves are 220.6853 million tons. The designed productive capacity is 3.0 million tons per year. The service life is 61.3 years. The normal water flow of the mine is 437 m3 per hour and the max water flow is 586 m3 per hour. The Relative gas discharge quantity is 10 m3 per ton, whichmeans it is a high gaseous mine. The coal seam is hardly spontaneous combustion and the level of spontaneous combustion is Ⅲ. Apart from coal without gas, the coal seam is of high explosion hazard.
The development of the mine is double levels with vertical shaft at the first level and inclind shaft at the second level. The number of the working faces is only one. The mining method is Comprehensive mechanization with putting off the top coal technology. Several belt conveyers undertake the job of coal transport in the mine and the auxiliary transportation system is centralized juxtapose. The ventilation method is diagonal ventilation system.
The working days in a year are 330. Everyday it takes 16 hours in lifting the coal. The working system in the mine is “four-six”.
The title of the special subject part is “Underground Coal Gasification in mining technology basic research”. By some examples of coal mine project, analyzed and calculated by modeling, Study the mobility characteristics of the roof strata in underground coal gasification process, the variation of the semi-coke pore structure in the process of underground coal gasification and underground coal gasification process in the overburden rock stress field value, conclusions drawn on these three aspects wind stress, the evolution of deformation is obtained when the dual roadway deformation, Deputy Lane by the basic law of mining and the left pillar set a reasonable size, with similar conditions Roadway reference.
The translated academic paper is about classification technique for danger classes of coal and gas outburst in deep coal mines. Its title is “Simulation of CO2-geosequestration enhanced coal bed methane recovery with a deformation-flow coupled model”.
Keywords: design of mine; fully mechanized mining with top coal caving technology;Mining area ventilation;vertical shaft development;mining distr
收藏
編號(hào):5055523
類型:共享資源
大?。?span id="mzebxcnn0" class="font-tahoma">3.79MB
格式:ZIP
上傳時(shí)間:2020-01-17
50
積分
- 關(guān) 鍵 詞:
-
祁東
煤礦
3.0
Mta
設(shè)計(jì)
CAD
- 資源描述:
-
祁東煤礦3.0Mta新井設(shè)計(jì)含5張CAD圖.zip,祁東,煤礦,3.0,Mta,設(shè)計(jì),CAD
展開(kāi)閱讀全文
- 溫馨提示:
1: 本站所有資源如無(wú)特殊說(shuō)明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
2: 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
3.本站RAR壓縮包中若帶圖紙,網(wǎng)頁(yè)內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒(méi)有圖紙預(yù)覽就沒(méi)有圖紙。
4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
5. 裝配圖網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
裝配圖網(wǎng)所有資源均是用戶自行上傳分享,僅供網(wǎng)友學(xué)習(xí)交流,未經(jīng)上傳用戶書(shū)面授權(quán),請(qǐng)勿作他用。